EF Logo

Crane lift percentage calculator: how much of the chart is used

Add the load, rigging, hook block and any deductions, divide by the chart capacity at the working radius, and see whether the lift is inside the limit your site sets.

The formula

Capacity used = (load + rigging + hook block + deductions) ÷ chart capacity × 100.

What it works out

Add up everything on the hook and divide by the chart capacity at the working radius.

Why it matters

Many sites treat a lift above 75 to 85% of the chart as critical and need a plan for it.

How to use it

  1. Enter the Load Weight in tonnes.
  2. Enter the Rigging (slings, shackles, spreader beam) and the Hook Block and Ball weights. Both come off the crane’s capacity.
  3. Enter any Jib, Stowed Extension or Other Deduction that the load chart says to subtract.
  4. Enter the Chart Capacity at the Radius, taken at the maximum radius the load reaches, and your Site Limit (75% by default).
  5. Read Capacity Used and the spare tonnage to your limit and to the chart. A negative spare means the lift is over.

Quick reference

Printable chart

Capacity used by load (30 t chart capacity, 0.4 t rigging, 0.8 t hook block)

Load (t)Capacity used (%)Spare to 75% (t)Spare to chart (t)
520.67 %16.3 t23.8 t
1037.33 %11.3 t18.8 t
1554 %6.3 t13.8 t
1864 %3.3 t10.8 t
2070.67 %1.3 t8.8 t
2587.33 %-3.7 t3.8 t

A 30 t chart capacity at the radius and a 75% limit.

The formula

Capacity used (%) = (load + rigging + hook block + deductions) ÷ chart capacity at the radius × 100. Spare to limit = chart capacity × limit ÷ 100 − total weight. Everything that hangs below the boom tip is part of the load, not only the weight of the object.

Where 75% comes from

Many contractors and clients, and some lifting procedures, treat a lift at more than 75 to 85% of the chart as a critical lift that needs a written plan, a lift supervisor and extra checks. It is a company or project rule, not a figure in the chart. The limit field lets you set whatever your procedure uses. A lift over 100% of the chart is outside the crane’s rated capacity and must not be made.

Radius, configuration and the chart

Capacity falls as the radius grows, so read the chart at the largest radius the load reaches during the whole lift, including the swing and set-down, and at the exact boom length, outrigger span and counterweight set-up in use. Wind, ground slope and a moving crane reduce what the chart allows. Use the manufacturer’s chart for the machine on site, and have the competent person confirm the figures.

Worked examples

  • An 18 t load with 0.4 t of rigging and a 0.8 t hook block puts 19.2 t on a 30 t chart: 64 % used, with 3.3 t spare to the 75% limit.
  • A 24 t pick with a stowed jib deduction is 26.3 t on the same chart, 87.67 %. Spare to 75% is -3.8 t, spare to the chart is 3.7 t.
  • With a 60 t chart capacity and an 85% project limit, a 40 t load comes to 70.5 %, leaving 8.7 t to the limit.

Frequently asked questions

How do I calculate crane capacity percentage?

Add the load, rigging, hook block and deductions, divide by the chart capacity at the working radius, and multiply by 100.

Is 75% of capacity a legal limit?

No. It is a common company and project rule for what counts as a critical lift. Follow the procedure of your own site and client.

Do I include the hook block and slings?

Yes. They hang on the boom, so they use up capacity. The load chart or crane manual says what to subtract.

Which radius do I use on the chart?

The maximum radius reached anywhere in the lift, not just at the pick or the set point.

What if the percentage is over 100?

The lift is beyond the crane’s rated capacity. Use a bigger crane, shorten the radius or reduce the load.

Add this calculator to your website

Copy the code and paste it into your page. The calculator is free and works as it does here.

<iframe src="https://www.equipmentsfinder.com/embed/field-tools/crane-lift-percentage-calculator" title="Crane lift percentage calculator: how much of the chart is used" width="100%" height="620" style="border:0;max-width:720px" loading="lazy"></iframe>
<p style="font-size:12px"><a href="https://www.equipmentsfinder.com/field-tools/crane-lift-percentage-calculator">Crane lift percentage calculator: how much of the chart is used</a> by <a href="https://www.equipmentsfinder.com">EquipmentsFinder</a></p>
EquipmentsFinder

Need equipment? Have equipment?