The formula
Load moment = (load + rigging) × margin × radius; class ≈ moment ÷ 3 m.
What it works out
A first estimate of the crane class a lift needs.
Why it matters
Ask for the right crane before the lift plan.
How to use it
- Enter the Load Weight in tons: the object being lifted.
- Enter the Rigging & Hook Block weight in tons: slings, shackles, spreader beam and the hook block.
- Enter the Working Radius in metres, measured from the centre of the crane’s rotation to the load.
- Enter the Lift Height in metres, and set a Safety Margin (%). The default margin is 25%.
- Read Total Lift Weight, Load Moment, Minimum Boom Length and Suggested Crane Class, then ask hire companies for a crane of that class or larger.
Quick reference
Printable chartCrane class by working radius (8 t load, 0.5 t rigging, 15 m lift, 25% margin)
| Radius (m) | Load moment (t·m) | Minimum boom (m) | Suggested class (t) |
|---|---|---|---|
| 3 | 31.88 t·m | 18.25 m | 25 t |
| 5 | 53.13 t·m | 18.68 m | 25 t |
| 8 | 85 t·m | 19.7 m | 30 t |
| 10 | 106.3 t·m | 20.59 m | 40 t |
| 12 | 127.5 t·m | 21.63 m | 50 t |
| 15 | 159.4 t·m | 23.43 m | 60 t |
| 20 | 212.5 t·m | 26.91 m | 80 t |
| 25 | 265.6 t·m | 30.81 m | 100 t |
| 30 | 318.8 t·m | 34.99 m | 130 t |
An 8 t load with 0.5 t of rigging, lifted 15 m with a 25% margin. Only the radius changes down the table.
The formula
Total lift weight = load + rigging. Load moment = total lift weight × (1 + margin ÷ 100) × radius. A crane’s headline tonnage is rated at a short radius of about 3 m, so the suggested class is the load moment divided by 3 m, rounded up to the next common size. Minimum boom length is the straight line from the crane to the load at its height plus 3 m of clearance.
Why radius matters most
Capacity falls quickly as the load moves away from the crane. A crane that lifts 8 tons easily at 4 m may lift a fraction of that at 20 m. Doubling the radius roughly doubles the moment, so the class you need can jump even when the load stays the same. Boom length, counterweight, outrigger setup, ground conditions and wind all affect the real capacity too, and none of them is in this estimate.
This is a first estimate, not a lift plan
Use the result to ask for the right crane before the lift plan exists. The final choice must come from the crane’s own load chart at the actual boom length and radius, and be approved by the appointed person or lift supervisor, who also checks the ground bearing, the exclusion zone and the rigging. On UAE sites a lift plan and a certified operator, rigger and signalman are normally required before any critical lift.
Worked examples
- An 8 t load with 0.5 t of rigging is 8.5 t on the hook. At a 12 m radius the moment is 127.5 t·m, so ask for a crane of about 50 t with a boom of at least 21.63 m.
- Setting a 3 t plant item 8 m from the crane, 10 m up: 3.3 t total, suggested class 25 t.
- A 20 t precast unit at a 20 m radius, 25 m up, needs a moment of 537.5 t·m and a boom of 34.41 m: ask for a 200 t class crane.
Frequently asked questions
What size crane do I need?
Add the load and the rigging, add a safety margin, multiply by the working radius, and compare with the crane’s load chart. This calculator gives a first estimate of the class; the load chart gives the answer.
How do I use a crane size calculator?
Enter the load, the rigging weight, the radius and the lift height. The Suggested Crane Class is the size to ask hire companies for, and the Minimum Boom Length tells you how long the boom needs to be.
Why does the radius change the crane size so much?
Because the load moment is weight times distance. The farther the load is from the crane, the more it tries to tip it, so rated capacity drops steeply with radius.
What should I include in the rigging weight?
Everything that hangs under the boom tip apart from the load: slings, shackles, spreader or lifting beam, and the hook block. Your crane supplier can give the block weight.
Is this a lift plan?
No. A lift plan must use the crane’s load chart and be approved by the appointed person or lift supervisor. Use this tool only to start the conversation with the crane supplier.
Add this calculator to your website
Copy the code and paste it into your page. The calculator is free and works as it does here.
<iframe src="https://www.equipmentsfinder.com/embed/field-tools/crane-size-calculator" title="Crane size calculator: what size crane do I need?" width="100%" height="620" style="border:0;max-width:720px" loading="lazy"></iframe> <p style="font-size:12px"><a href="https://www.equipmentsfinder.com/field-tools/crane-size-calculator">Crane size calculator: what size crane do I need?</a> by <a href="https://www.equipmentsfinder.com">EquipmentsFinder</a></p>