Tipper Truck Required For Rent
From the contractor: Tippers Trucks required for transport from al quoz to barsha south. Kindly call or email for details.

Need equipment? Have equipment?
Buyers post one request and get quotes from verified suppliers. Suppliers list free and reach active demand.

From the contractor: Tippers Trucks required for transport from al quoz to barsha south. Kindly call or email for details.

From the contractor: we would greatly appreciate it if you could provide your quotation for the transportation service based on the following details: TRANSPORTATION INQUIRY TRUCKS REQUIRED: 3XL TIPPER TRUCK MATERIALS: LIMESTONE AGGREGATE LOADING: AL AIN CRUSHER, FUJAIRAH CITY OFFLOADING: BLOCK FACTORY, ABU DHABI MUSAFFAH ICAD-1 DAILY TRIPS REQUIRED: 10 - 12 TRIPS or APPROXIMATELY 800 – 900 TONS PER DAY DURATION OF SERVICE: OPEN PRICING: TOLL GATE INCLUDED Please also indicate any additional charges, terms, and conditions that may apply. Should you require any clarifications, please don't hesitate to contact us.

From the contractor: 30 SEATER Or 20 SEATER BUS WITH DRIVER WITH AC MODEL SHOULD BE 2024 / 2025 for Monthly Basis.

From the contractor: Looking for 40 Ton long boom excavator for project in Dubai for 2 Months.

From the contractor: 3-5 ton capacity on rent in Abu Dhabi

From the contractor: For rent

From the contractor: Dear, Greetings ! We are inviting you to submit your best offer for the monthly rental rates for the following machinery: 1. Grader - 1 Nos ( Good condition) 2. Dump Truck 20 M³ - 2 Nos Project Location : CT4-Storage Yard Facility Development Container Terminal 4, Jebel Ali, Dubai https://maps.app.goo.gl/tECLtpn92Ajzjiu2A Please include in your quotation: Rental rates (monthly) Complete technical specifications of the machine Third-party certification for both the operator and machinery (required at mobilization time) Required operator documentation (NOC, Emirates ID, Visa copy, Passport Copy Recent Photo (JPEG format),Company Trade License) - (required at mobilization time) with operator, excluding fuel and Accommodation and transportation. Additionally, please specify the delivery lead times. We appreciate your prompt attention to this request and look forward to your response. Mob: +971 562107556 MAYAKANNAN Senior Procurement Engineer SHAFA AL NAHDAH BUILDING CONTRACTING LLC

From the contractor: Monthly rental

From the contractor: Need good condition for the long terms total project requirements 15 Nos

From the contractor: Bobcat rental

From the contractor: 260ton Atex certification & 200ton crane Atex certification Mobilization and demobilization from our side Atex certification will be done from our side Both crane We need : weekly-7 days (double shift 24 hrs) Deisel from our side With 2nos operator Operators food and accommodation will be from our side

From the contractor: 3 Dozers (D8) & 1 Wheel Loader (966) Required on a monthly basis for a project based in Abu Dhabi

From the contractor: 3 Ton Forklift required on a monthly basis for a period of 2 months for a project based in Central Dubai

From the contractor: (A type) trailers required to transport pre cast walls from Al Ain to Bani Yas a total of 13 trailers for at least 2 months
Buyer access
View the full requirement and contact details in one place.

For equipment owners
Put your fleet in front of active buyers across the marketplace.
View listing plans
Weekly requests, last 6 months
See the full trend