Need equipment? Have equipment?
Buyers post one request and get quotes from verified suppliers. Suppliers list free and reach active demand.
7 listings available
Seven generators are listed for hire in Abu Dhabi on EquipmentsFinder today, each from a different supplier, so 7 suppliers in all. All of them are in Mussafah. Perkins is the most common engine with 4 listings, and Caterpillar and Cummins have 1 each. None of the suppliers is verified at present.
The fleet in the emirate is small compared with the country as a whole, so the UAE generator hire page is worth checking alongside this one, and the Abu Dhabi rental hub lists compressors, lighting towers and the other site support equipment available here.
A generator listing shows the kVA rating, the engine brand, the canopy type and the year where the supplier entered them, along with any published rate. Contact details are on the listing: phone and WhatsApp. EquipmentsFinder charges the renter nothing and adds no commission.
Give the supplier the load in kVA or kW, the voltage and phase, how many hours a day the set will run, the site location and the hire length. Mussafah suppliers can usually deliver a towable or skid-mounted set to a site in the city within a day, with a technician to connect and commission it where the supplier offers that service.
The seven listings are not tagged by subcategory, so the listing title and photos show which of the types below each one is.
All of the sets listed in Abu Dhabi are diesel, which is the standard for site and standby power across the emirate. Perkins, Caterpillar and Cummins engines are all well supported for parts and service in Mussafah.
Canopied, sound-attenuated sets are required near housing, offices, hotels and events on the Corniche and the islands, and are the norm for anything running overnight. The canopy also protects the set from dust and sun, which matters on open sites in Al Dhafra.
Trailer-mounted sets can be moved by a pickup between short jobs, which suits road maintenance crews, utility works and event contractors who change location every few days.
Prime-rated sets are built to run as the main supply for a site for months; standby-rated sets are for backup during grid outages at pump stations, clinics and data rooms. The rating on the listing decides which duty the set is suited to.
Add up the running load of everything the set will feed, then allow for the starting current of motors such as pumps, compressors and air conditioning, which can be several times their running draw. A set loaded between half and three quarters of its rating runs cleanly; one that idles at a fraction of its rating builds up carbon and needs more servicing.
Summer temperatures in Abu Dhabi reduce a set's output, so a derating margin is sensible for sets running outdoors in July and August. Three-phase sites also need the load balanced across phases, which the supplier's technician can check at commissioning.
A construction site in KIZAD or on Saadiyat typically needs a prime-rated set in a dust-resistant canopy, sized for tower crane, hoist and welding loads, with a bulk fuel tank and a fuel delivery arrangement. An event on the Corniche or at a hotel on Yas needs a silent set with a clean, stable supply for lighting, sound and catering, often with a second set as backup and a distribution board with the right connectors. Say which case applies when asking for a quote.
None of the 7 Abu Dhabi generator listings publishes a rate today, so there is no daily or monthly figure to quote for the emirate. Suppliers price on request, usually as a daily, weekly or monthly rate that depends on the kVA rating, the canopy, the hire length and the services included.
Ask whether fuel is included or charged by the litre, whether a technician attends for delivery and commissioning, how delivery and collection are charged, whether a distribution board and cables are part of the quote, and whether VAT is included. None of the listings states that an operator is included, and generators are normally hired without one; a technician visit is the usual alternative.
All 7 generator listings in the emirate are in Mussafah, which is where the suppliers' workshops and spare parts are. Delivery to ICAD, the city and the islands is a short run.
No generators are tagged to KIZAD or Ruwais today. Both are served from Mussafah, and for Ruwais the long distance makes a monthly hire with a fuel delivery arrangement more practical than repeated short hires.
No sets are listed on the island itself, but it is the most common destination for silent sets from Mussafah, for events, hotels and fit-out works where the building's own supply is not yet live.
Nothing is listed in Al Ain or Al Dhafra at present. Both are served from Mussafah with transport charged by distance; farms and remote sites in Al Dhafra tend to hire for months at a time.
With seven sets listed in the emirate, the quickest way to cover a specific kVA rating or a silent canopy requirement is to post a request with the load, dates and site location. Verified suppliers across the UAE see it and reply with their quotes.
None of the Abu Dhabi generator listings currently publishes a rate, so suppliers quote on request. The price depends on the kVA rating, whether the set is silent, the hire length and whether fuel, delivery, cables and a technician are included. Ask for those items separately so that quotes from different suppliers can be compared on the same basis.
Size the set from the total running load plus the starting current of motors, then pick the duty rating: prime for a set that is the main supply, standby for backup. Choose a silent canopy near housing, offices or events, and a towable set where the job moves around. The supplier can confirm the size from the equipment list.
Generators are normally hired without an operator, and none of the current Abu Dhabi listings states that one is included. Many suppliers send a technician to deliver, connect and commission the set and return for servicing or faults. Ask what the supplier's call-out arrangement is, especially for sets running overnight or at remote sites.
Yes, daily hire is common for events, testing and short outages, and towable sets are built for it. A single day is usually charged as a minimum day plus delivery and collection, so for anything over a few days a weekly or monthly rate is better value. Confirm the fuel arrangement for short hires.
All seven listed sets are in Mussafah and the suppliers deliver across the emirate, from the islands and KIZAD to Al Ain and Ruwais, with the charge based on distance. No sets are listed outside Mussafah today, so for a remote site in Al Dhafra it is worth posting a request to reach any supplier already working nearby.
Perkins engines power 4 of the 7 listed sets, with Caterpillar and Cummins at 1 each. All three have parts and service support in Mussafah. The listings do not state model years, so ask the supplier for the year, the hour reading and the last service date when enquiring, particularly for a set that will run as prime power.