1 listing available
1 listing from 1 seller in Riyadh. Updated 16 November 2026.
How it is priced: most sellers quote on request, and the price follows the model, year, hours, condition and where the machine is. Request a quote
One pipe layer is currently listed for sale in Saudi Arabia, from one supplier who is not yet verified: a 2018 Caterpillar sideboom located in Riyadh. Pipe layers in the Kingdom are owned mainly by oil, gas and water pipeline contractors and are sold when a spread demobilises, so the stock on any day is small and a request often finds machines that are not advertised.
The machine appears on the Riyadh page, while the Makkah Region and Dammam Eastern Province pages will fill as sellers post there. For a single pipeline contract, pipe layers for hire avoid the capital outlay, and the buy hub covers dozers, excavators and the rest of a pipeline spread.
The seller writes the listing: photos, rated lifting capacity, boom length, year, hours, counterweight details and a phone or WhatsApp number. Buyers call directly, arrange an inspection and agree the sale with the seller; EquipmentsFinder charges buyers nothing and takes no commission. Suppliers list free and can pay for plans that give their ads more visibility. A purchase request describing the pipe diameter, the lifting capacity needed and the project location is sent to verified suppliers across the Kingdom and often brings out machines that were not yet advertised.
A pipe layer, or sideboom, is a crawler tractor with a boom hinged to one side, a hook block on a winch and a counterweight that swings out on the other side. Several machines walk the right of way together, lifting a welded pipe string over the trench and lowering it in. Rated lifting capacity at a short radius is the figure that defines the class.
Machines rated from about 18 to 40 tonnes, built on tractor bases of 160 to 250 horsepower. They carry the steel and ductile-iron pipe used for water transmission, sewerage and gas distribution up to roughly 24 inches, and the smaller ones move on a standard low-bed with the counterweight removed.
Rated at 70 tonnes and more on tractor bases above 300 horsepower. These handle the 36 to 56 inch coated steel pipe used on oil and gas trunk lines and large water transmission schemes, and are normally sold in matched sets by a contractor finishing a project.
Work the load out from the pipe. The mass per metre of the heaviest coated and lined section, multiplied by the length of string carried between machines and divided by the number of sidebooms in the lift, gives the load on each hook. Capacity falls quickly as the boom is lowered to reach across the trench, so read the load chart at the working radius rather than the headline figure, and keep a margin for ground that is softer than expected.
On a used machine the expensive parts are the undercarriage, the winch brakes and the boom. Measure track chain, sprocket and roller wear, since a full undercarriage rebuild on a large sideboom is a major cost. Check the boom for cracks at the foot and hook block, confirm the counterweight is complete and extends freely, and have the winch brakes tested under load. Ask for the load chart, the rigging certificate and the maintenance record.
The one pipe layer listed today does not show a published price, so there are no figures to quote. Pipe layer prices are set by each seller and shown on the listing where published; where they are not, the phone or WhatsApp number on the ad is the way to get a quote. Capacity class, year, hours, undercarriage life and whether the machine comes with its counterweights, hook block and spare rigging decide the figure. Ask the seller whether VAT, loading, transport to site and any inspection certificate are included in the number.
The one machine listed today, a 2018 Caterpillar, is in Riyadh. Water transmission and gas distribution schemes around the capital keep pipeline contractors active in the central region.
Desalination and water transmission lines from the Red Sea coast inland use sidebooms, and contractors working out of Jeddah will deliver to Mecca and the rest of the west.
Much of the Kingdom's oil and gas pipeline work runs between Dammam, Jubail and the oil fields, so large-capacity sidebooms are most likely to be offered in the east when projects close.
No seller in the Holy Cities has listed a pipe layer. A request from a buyer there is answered by sellers in Riyadh and Jeddah, who move machines by low-bed.
If the one machine listed today is not the right class, post a request giving the pipe diameter, lifting capacity, number of sidebooms and delivery region. Verified suppliers reply with availability and a SAR price, and the request is visible on the inquiry board. Contractors with sidebooms coming off a project can list them free.
Only one pipe layer is listed in Saudi Arabia today and it carries no published price, so there is no price range to report. The seller quotes on request through the listing. Price depends on rated capacity, year, hours and the condition of the undercarriage, winch and boom, and on whether counterweights and rigging are included.
Size the machine to the heaviest coated pipe section it will carry at the working radius, shared with the other sidebooms in the lift, and keep a margin. Distribution and water lines up to 24 inches are handled by the 18 to 40 tonne class; trunk lines of 36 inches and above need the 70 tonne class and usually several machines.
A new sideboom is built to order with a long lead time and only pays back on a multi-year pipeline programme. Used machines released by demobilising contractors are far cheaper, available at once and often come as matched sets. The 2018 Caterpillar listed today is the kind of machine that fits a contractor starting a single spread.
Yes. Call or message the seller through the listing and arrange a visit with a test lift. Watch the boom raise and lower under load, check the winch brakes hold, look for cracks at the boom foot and counterweight frame, measure undercarriage wear and confirm the serial number against the plate before agreeing anything.
A sideboom is tracked plant and is not registered as a road vehicle, so the sale is completed with a signed sale agreement or invoice quoting the serial number, a copy of the seller's commercial registration and proof of payment. Ask for the load chart, the latest lifting inspection certificate and the service history, since pipeline clients will ask for them.
Heavy equipment operators need a valid licence for the machine class, and crane lifts on construction sites need a lift plan. Pipeline clients in the Kingdom usually apply the same requirement to sideboom lifts, so plan for qualified operators and a current inspection certificate before the machine starts on a right of way.
1 listing from 1 seller in Riyadh. Updated 16 November 2026.
How it is priced: most sellers quote on request, and the price follows the model, year, hours, condition and where the machine is. Request a quote

Not seeing the right machine?
Post one request and every supplier with the pipe layers you need sees it. They contact you. Free, always.
Free · takes 45 seconds