No horizontal drilling rigs are listed for hire in Saudi Arabia today. Horizontal directional drilling, or HDD, puts cables, fibre ducts, water and gas pipes under roads, railways and wadis without opening a trench, and in the Kingdom it is the usual method for crossing a highway in Riyadh or a dual carriageway on the Dammam to Khobar corridor.
A bore request with the pipe diameter, the bore length, the ground type and the crossing location reaches verified suppliers across the Kingdom. The Riyadh, Makkah Region and Dammam Eastern Province pages show regional listings as they appear, and the HDD rigs for sale page covers purchase.
EquipmentsFinder charges renters nothing and takes no commission. When listings appear here, each will show the rig's pull-back force, torque, drill pipe length and year, with the supplier's phone and WhatsApp number for direct contact. The renter describes the bores, the supplier proposes a rig and a crew, and the price is usually agreed per metre or per crossing with mobilisation on top.
Small tracked rigs with pull-back in the low tens of kilonewtons, used for fibre and telecom ducts, house connections and short road crossings in built-up areas.
Rigs in the 100 to 400 kilonewton range that install water, sewer rising mains, gas and power ducts under major roads and railways over several hundred metres. The common hire size for utility contractors.
Maxi rigs with pull-back above 400 kilonewtons for long pipeline crossings under wadis, highways and shorelines, often with steel pipe in large diameters. Hired for a defined crossing rather than by the day.
Four things size an HDD rig: the pipe diameter, the bore length, the ground and the entry and exit angles. The rig must have enough pull-back to drag the product pipe through the reamed hole with a margin, and enough torque to ream in the ground present. Sand and silt bore easily with a good drilling fluid; the cemented gravel, limestone and rock around Riyadh and in Dammam Eastern Province call for a mud motor or a rock reamer and a larger rig than the pipe size alone suggests.
No HDD rig is listed in the Kingdom today, so there are no SAR rates to report. When suppliers list, rates are set by each supplier and shown on the listing where published, and HDD work is commonly priced per metre of bore or per crossing rather than per day. Mobilisation, the drilling crew, drilling fluid and disposal, reamers and tooling wear, fuel and VAT vary by supplier and are confirmed with the quote.
No supplier is listed in Riyadh, the Makkah Region or Dammam Eastern Province today. Fibre and utility rollouts in Riyadh, the development corridor north of Jeddah and the pipeline and industrial work of Jubail and Dammam are where HDD crews are most active, and a request that names the crossing lets a supplier with a rig already in the region quote without a long mobilisation.
No horizontal drilling rigs are listed for hire in the Kingdom today, so no SAR rate can be quoted. When listings appear, the supplier's rate is shown on the listing where published, and HDD work is usually priced per metre of bore or per crossing with mobilisation, crew, drilling fluid and tooling as separate items. A posted request brings a full quote.
A compact rig for fibre ducts, house connections and short crossings in streets; a mid-size rig for water, gas and power ducts under major roads and railways; a maxi rig for long pipeline crossings in large diameters. Give the supplier the pipe size, the bore length and the ground, and the rig class and tooling follow from those.
Almost always, because an HDD rig is hired with its driller, locator operator and mud technician as a crew, but it varies by supplier and is stated on the listing or confirmed when the supplier is contacted. Operators need a valid licence for the machine class. Ask how many crew come with the rig and how many metres a shift they expect to bore.
A compact rig on a short road crossing can be a one-day job, with mobilisation charged on top. Mid-size and large rigs take time to set up, mix fluid and run the pilot bore, reaming and pull-back, so suppliers quote per crossing rather than per day. For a single short bore, a crew already working nearby is the practical option.
No supplier is listed in the Kingdom today, so coverage cannot be stated. Compact rigs travel on a trailer and larger rigs on a low-bed with a mud unit and a water bowser, so mobilisation is charged by distance and suppliers favour work in their own region. A posted request that names the crossing lets the nearest supplier reply.
A utility survey of the crossing, any ground investigation, the entry and exit pits or space to dig them, a water supply for drilling fluid, a place to dispose of returns and the product pipe on site and ready to string out. With those in place the rig can start on arrival and the per-metre price covers the work rather than the waiting.