Truckloads by volume (fill at 1.5 t/m³, 16 m³ body, 25 t payload)
Fill at 1.5 t/m³ with 25% swell, hauled in 16 m³ tippers with a 25 t payload. Change the inputs above for your material and truck.
| Volume (m³) | Weight (t) | Loads by volume | Loads by weight | Truckloads needed |
|---|---|---|---|---|
| 100 | 150 t | 8 loads | 6 loads | 8 loads |
| 250 | 375 t | 20 loads | 15 loads | 20 loads |
| 500 | 750 t | 40 loads | 30 loads | 40 loads |
| 1,000 | 1,500 t | 79 loads | 60 loads | 79 loads |
| 2,000 | 3,000 t | 157 loads | 120 loads | 157 loads |
| 5,000 | 7,500 t | 391 loads | 300 loads | 391 loads |
www.equipmentsfinder.com/field-tools/dump-truck-load-calculator